Airmax
Projects
Projects

Evolution Gaming

T. Eristavi st. 1, st. Tbilisi

Heating, air conditioning, ventilation and sewerage works were carried out

Three heat pumps with a total capacity of 810 kW were installed

Four flow hoods (AHUs) and 162 fan coils were installed